These works involve replacing an existing 30+ year old motor control panel with a new custom built MCCB panel board with PLC control.
This board controlled the Airhead LV infrastructure and in the event of an incident on the Airhead a load shed-ding sequence was integrated into the initial design to switch off the non-essential loads to provide enough power to run two deluge pumps to ensure fuel was safely removed from the storage tanks.- Client: Interserve Defence Limited
- Construction Years: Oct/Nov 2019
- Location: Ascension Island, South Atlantic
- Duration: 6 Weeks
- Sector: Private